• Skip to main content
Atlas Energy Storage Systems
  • Products
    • Ranger EV Batteries
    • Marine Batteries
    • All Products
  • Support
  • Contact
  • 1-415-755-3864
7.7kWh 12v, 24v, 48V LFP Marine Propulsion Battery (Coming Soon)

7.7kWh 12v, 24v, 48V LFP Marine Propulsion Battery (Coming Soon)

$3,300.00

7.7kWh 12v, 24v, 48V LFP Marine Propulsion Battery Atlas ESS

Out of stock

Categories: Marine Batteries, Universal Batteries
  • Description
  • Additional information

Description

Would you wait 3 weeks to save thousands ? If yes, our 7.7kWh Marine Propulsion battery is for you.

This 7.7kWh battery can be configured as 12v, 24v, 32v, 48v, 60v, 72v, 96v etc.

Our 7.7kWh battery uses 150ah top quality REPT cells. Rated for 4,000 cycles and continuous discharge of 1C and 3C for 60 seconds. Cell spec is on our support page. The 7.7kWh Marine Propulsion Battery consists of a battery box with cells and bms and a water proof PDM (Power Distribution Module) that contains two contactors and other controls. You can choose discharge ratings of 200 amps or 400 amps. Cells and bms are water proof. The bms is optically isolated from the cells and uses contactor switching. Battery has been designed to be repaired by the user on the boat. Every part can be swapped out. With a handful of spare parts you can keep it running after a disaster like a lightning strike or flooding. The power cables are waterproof, finger safe, quick connect without tools. It has an emergency power feature. 10 year pro rated transferable warranty covering parts and workmanship.

You can connect the batteries in parallel or series. The battery boxes stack and bolt together. Four 7.7kWh batteries can connect to one PDM and larger capacities are possible. Add more batteries anytime.

Battery complies with ABYC TE-13. BMS has UL508. Battery box has UL50E. Cells have their own certs from cell manufacturer.

Cells are much cheaper in China than in the USA. We buy direct from the factory. We have cells in stock and can deliver your battery in 3 weeks. You get high quality at a low price. Your purchase is protected by your credit card company. The bank does the credit card processing. We don’t see your credit card information.
Call or email if you have questions. info@atlas-ess.com 415 755 3864. We ship anywhere.

We have been building lithium battery packs since 2010.

Additional information

Voltage

48, 24

Model

24v / 48v, 280ah

Related products

  • DIY 15kWh LFP Battery Kit For Polaris Ranger EV

    DIY 15kWh LFP Battery Kit For Polaris Ranger EV

    $2,250.00
    Add to cart
  • 35KWH  668ah  LFP Battery For Polaris Ranger EV

    35KWH 668ah LFP Battery For Polaris Ranger EV

    $9,000.00
    Add to cart
  • 15.6kWh  304AH  LFP  Battery For The Ranger EV

    15.6kWh 304AH LFP Battery For The Ranger EV

    $4,500.00
    Add to cart
  • 17+  17.1kWh  334AH  LFP  Battery For The Ranger EV

    17+ 17.1kWh 334AH LFP Battery For The Ranger EV

    $4,950.00
    Add to cart
Atlas Energy Storage Icon

Shop Batteries

  • Shop

Support

  • Returns Policy
  • Delivery Policy
  • Warranty
  • Documentation & Guides

Contact

(415) 755-3864

(415) 755-3864

info@atlas-ess.com

info@atlas-ess.com

© 2026 Atlas - Energy Storage Systems. All Rights Reserved.

  • Privacy Policy
  • Terms and Conditions
  • Update cookies preferences